Glidehouse by Michelle Kaufman Designs (Prefab)

General Description:  The Glide House is a factory-built modular home designed by Michelle Kaufman Designs.  The house is an example of clean simple modern living with an emphasis on both the internal and exterior environment.  The design is available in several different configurations which  are all based on common dimensions to facilitate factory-construction, easy transportation, [...]

By jonasrisen

house01

General Description:  The Glide House is a factory-built modular home designed by Michelle Kaufman Designs.  The house is an example of clean simple modern living with an emphasis on both the internal and exterior environment.  The design is available in several different configurations which  are all based on common dimensions to facilitate factory-construction, easy transportation, and quick on site assembly.

The Glidehouse has large open spaces with big windows along one entire facade to create a sense of spaciousness within the modest dwelling.  Storage and utility spaces are cleverly built into a core strip along one edge of the building which further serves to emphasize the open living, dining and kitchen areas in the plan.  The storage space is also flexible to accommodate varied styles of living and frees the living area of the house from clutter. 

The house is available in one, two, three and four bedroom versions with an optional two story plan.  Buyers can also choose from several different window, door, wall, flooring, fixture, facade and roofing options.  These options allow a moderately customized house design to be made starting with a limited number of plans.

The Glidehouse is designed with fundamental “green” building strategies in mind.  The long shallow building form encourages cross ventilation and this is encouraged by large windows on the living side and clerestory windows above the service core.  The house does not come standard with any SPV, SHW, GeoTH, or WGR systems but all are available after consultation.  Further design of the house may be required to facilitate incorporation of “green” technologies.  Materials are chosen based on environmental criteria and the factory-based construction system maximizes efficiency of materials and captures waste while not significantly affecting the area adjacent to the building site. 

house21

Construction Process:  Delivery of the house is streamlined to help create the simplest and most accessible buyer experience possible and increase predictability of product.  Step one is to obtain the land.  Step two is to get financing.  Step three is to meet with MKD and decide on the options needed.  Step four is obtaining engineering and permits.  Step five is production of the home by the MKD factory and preparation of the site.  Step six is delivery and buttoning of the house modules.  Taken as a whole the buyers experience, while not offering the tremendous freedom of designing a home from scratch with an architect, is scripted to be straightforward and prompt.

This SimpleViewer gallery requires Macromedia Flash. Please open it in your browser or get Macromedia Flash here.
This is a WPSimpleViewerGallery

Tags: , , , , , , , ,

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*
  • News

  • <?php the_title(); ?>
  • 08.Dec
  • 15 Greenest Cities on the Globe
  • I am oftentimes skeptical about the myriad of lists one can find out there covering everything from foreclosure rates in metro areas to best cities to fall in love. I have a hard time with most of these rankings because I am a big fan of quantifying results before something is published as truth and [...]

  • Products

  • <?php the_title(); ?>
  • 22.Oct
  • Counterfeit Countertops
  • All Paper Recycling, Inc. has created a product called Shetka Stone that can be used for a variety of uses including countertops, fabricated panels, benches and tile. Shetkastone is made from100% pre and post consumer waste paper, including counterfeit money and phone books. The material is scratch, stain, and water resistant and [...]

  • Case Studies

  • <?php the_title(); ?>
  • 23.Jun
  • Kelvin’s Conjecture: The Sustainability of Optimization and Integration
  • ”to make as effective, perfect, or useful as possible“ -Definition ‘Optimize’
    The National Aquatic Center in Beijing achieves sustainability through the optimization and integration of its structure, envelope, and building systems. In doing so it tells the story of how a little known problem of theoretical physics, Kelvin’s Conjecture, influenced the design of a prominent international [...]

  • Environment

  • <?php the_title(); ?>
  • 24.Oct
  • Phytoremediation-a safe alternative?
  • Recently I had the benefit of sitting in on lecture about using plants to treat environmental problems. The lecture was given by Dr. Lee A. Newman, who has been conducting research in the area of phytoremediation for the past 16 years. Her work at the University of South Carolina focuses on using plants [...]

  • Events News

  • <?php the_title(); ?>
  • 17.Oct
  • Climate Change Exhibit
  • An exhibit on the effects of Climate Change opens tommorow at the Museum of Natural History in New York and runs through August 16, 2009.
    “Climate Change will use realistic dioramas, hands-on activity stations, and dynamic animations to understand the climate’s response to the build-up of greenhouse gases and explore the repercussions for today’s world and [...]

About Greenline

Greenline is an open forum run by the GreenTeam at Ziger/Snead LLP Architects.

Our mission is to collect and share news and information on building technology, strategies, and products both within our office and with consultants, clients and future building occupants. We believe that education is fundamental to good design work, and so we have designed this blog as a resource to learn, explore and share topics such as high performance building, sustainable design, innovative products, health and productivity in buildings, and design aesthetics.

Save or Share